Cylinder overhaul

Cylinder Overhaul
Liebherr hydraulic cylinders
Cylinder overhaul D500 / 355

Cylinder overhaul

Reconditioning and repairing cylinders is everyday work for ABS. We overhaul or repair all brands of cylinders. Sometimes just replacing a seal is enough, but it sometimes happens that there is more to the problem.
Disassembling and reassembling hydraulic cylinders to overhaul them is a specialised job. Don't hesitate to hand it over completely to an expert in cylinders. One phone call and we will take care of the entire process.

Overhaul or still replace a cylinder?
Our specialists are familiar with all makes and types of cylinders. They will help you with honest advice, both technically and economically. Together, we will make a correct, but above all long-term profitable trade-off between rejecting the cylinder in time or ‘still perfectly repairable/completely overhaulable'.

Always fast, thanks to separate production line for cylinder overhaul
Cylinder overhaul is a separate, independent production line within ABS Cylinders. You are therefore always helped immediately, without delay.

What does an ABS cylinder overhaul involve?
There are numerous options, always ‘tailor-made’. Exactly what we do depends on the need and the condition of the cylinder to be overhauled.
This may involve a total ‘refurbishment’, where a cylinder that is still working well is given a whole new, second life. If this is not at all necessary, we opt for a limited, practical overhaul. The options in a comprehensive overhaul of a hydraulic cylinder:

  • Ceramic coating
  • Piston rod chrome plating or dechromating
  • Stroke lengthening/shortening
  • Cylinder tube honing (in-house production)
  • Repainting
  • Upgrade of sealing principle
  • Archiving/documenting existing designs on drawings

Short delivery time, short consultation lines, that's the standard at ABS Cylinders
Because we produce the parts for cylinders entirely in-house, delivery times can be surprisingly short. Machines idling due to a problem with cylinders is not an option for us. We know the importance of preventing production losses on time. Therefore, we will also always respond flexibly to your request for an overhaul, or a no-obligation consultation about it.

Once you have decided what is best and most economical, we will carry out the overhaul quickly, thoroughly and competently.